Install Drainage System
At 13:20 in
A Wall Failure I haven't seen before...
What happens here
Lay a perforated drainage pipe (often corrugated and flexible) behind the newly laid first course of retaining wall blocks. Ensure the pipe is properly positioned with the perforations facing downward or in a way that allows water to enter. Cover the drainage pipe with a layer of crushed stone aggregate to provide proper filtration and allow water to flow freely into the pipe while preventing soil from clogging it. This drainage system is vital for preventing water from saturating the soil behind the wall, which could lead to increased pressure and potential wall failure.
Goal: Install a perforated drainage pipe behind the first course of blocks to effectively manage water runoff and prevent hydrostatic pressure buildup behind the wall.
Tools and materials
- Rake
- Shovel
- Crushed Stone Aggregate
- Perforated Drainage Pipe