Inspect and Prepare the New Trench
At 9:26 in
A Wall Failure I haven't seen before...
What happens here
Thoroughly inspect the newly excavated trench, especially focusing on areas where the old wall failed. Look for signs of excessively wet soil or remnants of degraded blocks (like sand-like material). It might be necessary to add a thicker, more robust aggregate base to compensate for poor soil conditions. Use a laser level to establish precise grade and ensure a perfectly level base for the new blocks. Place insulation foam on the ground at the desired height for the wall's lowest point to assist with grading.
Goal: After removing the old wall, inspect the new trench area and prepare it for the new retaining wall installation, addressing any issues like wet soil or degraded materials.
Tools and materials
- Insulation Foam Boards
- Laser Level
- Laser Receiver
- Shovel
- Spray Paint
What they say
(574 characters)Hide
What they say
(574 characters)Auto-generated from the video audio.