Lay Subsequent Courses and Backfill

13:40
18:03
138.7K views

At 13:40 in

A Wall Failure I haven't seen before...

What happens here

Continue to lay subsequent courses of concrete blocks using a staggered pattern, ensuring each block is set back appropriately from the course below it. Each course should be carefully leveled both horizontally and front-to-back. After each course (or every two courses, depending on wall height and specifications), backfill the area behind the blocks and the geogrid (if used) with crushed stone aggregate. Spread the aggregate evenly and compact it thoroughly with a plate compactor or hand tamper. Repeat this process of laying blocks, installing rebar pins (if applicable), backfilling, and compacting until the desired height of the retaining wall is achieved. This step is crucial for the structural integrity and long-term performance of the wall.

Goal: Continue laying successive courses of blocks, ensuring each is properly aligned and leveled, followed by backfilling with aggregate and compacting behind each layer.

Tools and materials

  • Concrete Retaining Wall Blocks
  • Plate Compactor
  • Rake
  • Rebar Pins
  • Rubber Mallet
  • Shovel
  • Skid Steer
  • Spirit Level
  • Crushed Stone Aggregate