Assess Stair Structure and Plan Riser Installation — Prepare Riser Structure
Part of project
Stair Tread Installation · Step 1 of 7
In this video
Analyze the existing stair structure. The primary issue is that the old treads (the horizontal part) hung over the risers (the vertical part), creating a gap. The underlying wood is often 'crummy' and unsuitable for direct finishing. The solution proposed is to install new, primed 1x8 pine boards as risers to cover the gap and provide a clean, flush surface for the new treads. Small blocks are shown being used as temporary spacers or permanent supports behind the risers to prevent them from pushing back.
2.3M subscribers
Assess Stair Structure and Plan Riser Installation — Prepare Riser Structure
Part of project
Stair Tread Installation · Step 1 of 7
In this video
Analyze the existing stair structure. The primary issue is that the old treads (the horizontal part) hung over the risers (the vertical part), creating a gap. The underlying wood is often 'crummy' and unsuitable for direct finishing. The solution proposed is to install new, primed 1x8 pine boards as risers to cover the gap and provide a clean, flush surface for the new treads. Small blocks are shown being used as temporary spacers or permanent supports behind the risers to prevent them from pushing back.