Precisely Layout Post and Beam Positions
At 2:52 in
Why patio roofs fail - and how to build them right!
What happens here
To accurately position your support posts, first plumb down from the outside edge of your ledger board using a level and attach a straight 2x4 (a 'mark-up' board) to establish a baseline. Measure the desired projection from the ledger (e.g., 7 feet) along this temporary board. To ensure squareness at the corner, use the 3-4-5 triangle method: measure 3 feet along the wall from the corner, 4 feet along the temporary board from the corner, and then adjust the temporary board until the diagonal distance between the 3-foot and 4-foot marks is exactly 5 feet. Mark the ground for your footing at this precisely squared location.
Goal: Accurately mark the ground for post footings and ensure the structure is square.
Tools and materials
- 2x4 lumber — Used as a temporary mark-up board for layout
- Level — Plumbing down from the ledger to establish a vertical line
- Nail gun Milwaukee — Temporarily attaching the 2x4 mark-up board
- Pencil/Marker — Marking measurements
- Tape measure — Measuring distances for layout and the 3-4-5 method
What they say
(805 characters)Hide
What they say
(805 characters)Auto-generated from the video audio.