Attach Square Rod and Second Leveler
7:31
13:36
16K views
At 7:31 in
Werner Ladder Leveler Review | Best Levelers for Ladders
What happens here
With the first leveler unit still open (fully extended), insert the pre-cut square rod through its channel. Position the second leveler unit on the opposite ladder rail, making sure the square rod slides into its channel. Use the drill template again, aligning it carefully with the second leveler and the square rod to mark the drilling locations on this side. It is critical that the square rod is installed between the two levelers before drilling the second set of holes to ensure correct alignment and functionality. Drill all six marked holes on the second rail.
Goal: Securely attach both leveler units and the connecting square rod.
Tools and materials
- 1/4" Drill Bit — Drilling larger holes as specified by the template
- 1/8" Drill Bit — Drilling smaller holes as specified by the template
- Drill Bosch — Drilling pilot holes for the leveler attachment
- Drill Template — Guiding the precise placement of drill holes
- Permanent Marker — Marking drill locations on the ladder rail
- Pre-cut Square Rod Werner — Connecting and aligning the two leveler units
- Werner Level Safe Pro Leveler Unit — The second leveler to be attached
What they say
(477 characters)Hide
What they say
(477 characters)Auto-generated from the video audio.