Final Grading and Site Cleanup
10:28
14:41
56.3K views
At 10:28 in
Tough, Tight site
What happens here
With all the major earthmoving completed, the final steps involve removing the constructed ramp, disposing of excess soil and debris, and performing detailed grading to ensure proper water flow. The area where the pond once stood is now a leveled surface ready for patio installation, and the back of the house is regraded to direct water away from the foundation. The dry creek bed and other features are checked for proper functionality and aesthetics.
Goal: Achieve final grading, ensure proper water drainage, and clear the site.
Tools and materials
- Bobcat Mini-Excavator — Removing the ramp and final grading
- Cat Skid-Steer Loader Caterpillar — Loading debris and final soil movement
- Dump Truck — Hauling away excess soil and debris
- Rake — Smoothing surfaces and final touches
- Shovel — Fine-tuning grade and cleanup
- Excess Soil and Debris N/A — To be removed from the site
What they say
(1,415 characters)Hide
What they say
(1,415 characters)Auto-generated from the video audio.