Filling a Large Washout with Fabric and Soil
6:28
14:41
56.3K views
At 6:28 in
Tough, Tight site
What happens here
A significant wash-out area, approximately 3 feet deep, is identified and prepared for backfilling. Geotextile fabric is laid down into the hole to stabilize the soil and prevent future erosion. The mini-excavator then carefully backfills the area with soil, operating blind due to the angle, relying on a ground spotter for guidance.
Goal: Stabilize and backfill a large erosion washout.
Tools and materials
- Bobcat Mini-Excavator — Backfilling the washout
- Geotextile Fabric — Lining the washout for stabilization
- Soil On-site material — Filling the washout