Unloading Fill Dirt from Dump Trailer
At 2:03 in
TOUGH ACCESS landed a $5,000 Landscaping in a day #2
What happens here
After positioning the trailer, the operator activates the hydraulic lift to raise the dump bed, beginning the process of offloading the fill dirt. The dirt starts to slide out, but the narrator points out that the trailer's low clearance due to the backing position on the grass causes the rear to drag, making it difficult for all the dirt to exit. One crew member has to climb into the trailer to manually shovel the remaining dirt towards the opening, demonstrating the challenges encountered with specific trailer designs and terrain. The narrator uses this as an example of unexpected costs (labor time) that can add up on a project.
Goal: The dump trailer is hydraulically lifted to unload the fill dirt, with crew members assisting to clear stuck material and ensure proper ground clearance.
Tools and materials
- Shovel
- Sure-Trac Dump Trailer
- Fill Dirt
What they say
(1,062 characters)Hide
What they say
(1,062 characters)Auto-generated from the video audio.