Skip to main content

Spreading and Grading Berm Foundation

12:30
22:33
50.9K views

At 12:30 in

TOUGH ACCESS landed a $5,000 Landscaping in a day #2

What happens here

As the mini loader drops the piles of fill dirt at the construction site, crew members use shovels and rakes to manually spread the dirt. They work to establish the basic shape of the berm, ensuring a consistent slope away from the house foundation to facilitate proper water drainage. This initial spreading creates a relatively even layer of dirt, which is a crucial step before compaction to achieve a stable and functional berm structure.

Goal: Crew members manually spread and roughly grade the fill dirt, laying the foundation for the berm and preparing it for compaction, focusing on proper drainage away from the house.

Tools and materials

  • Rake
  • Shovel
  • Fill Dirt

What they say

Hide

so what do you guys think was it a realistic expectation and no turf damage considering they had the sprinklers on this morning which was unknown to tim and i that they were going to be doing that so this grass is soaking wet now i think this is going to bounce back pretty confident that'll bounce back i don't think that's going to have any major malfunctions tim's on his way to get another load of dirt some boulders here we've got the grade raised up one of the things we got to be careful of joey is we're too high right here okay we've got to have six inches at least the clearance for eight inches preferred below the sill plate right there so we won't be covering up the black on this side just because that's our point that we got to get everything from that point we got to go lower and get everything to run down and make sure that we're staying busy while tim is hiking materials into and out for us we got this area set up we'll start to put the rock out and get that laid out sound like a plan yep cool beans so this looks pretty good to me i like how joey's got this kicking away from the house

Auto-generated from the video audio.