Skip to main content

Material Delivery and Setup

0:00
22:33
50.9K views

At 0:00 in

TOUGH ACCESS landed a $5,000 Landscaping in a day #2

What happens here

The video opens with a black Ram 2500 pickup truck towing a black Sure-Trac dump trailer, full of fill dirt, driving down a paved driveway lined with trees and fallen leaves. The narrator provides an introduction to the project, highlighting it as a significant, single-day job focusing on materials, labor, equipment, overhead, and profit margins. The truck then backs the trailer into position on a grassy area beside the driveway, preparing to unload the dirt. One crew member is seen walking alongside the trailer, giving directions to the truck driver, while another crew member manually removes the safety chain from the rear gate of the dump trailer. The narrator emphasizes the importance of accounting for all costs, including the material delivery time and equipment usage.

Goal: A dump truck and trailer arrive with fill dirt. The crew positions the trailer for unloading, detaching the safety chains and preparing the hydraulic lift to dump the dirt.

Tools and materials

  • Ram 2500 Pickup Truck
  • Sure-Trac Dump Trailer

What they say

Hide

if you're just tuning in this is where we left off from yesterday's video we're going to be doing a 5 000 job in a single date and that may sound glamorous but we're going to take some of that glamour away and go to the hardcore facts during this three-part mini series when we're done with this mini series we're going to teach you guys or share with you guys our material costs our labor costs all of the equipment we used are overhead and where our profit margins are but today we just want to concentrate and show you guys exactly what the work is so that as you guys are going out and doing your own bidding and estimating you can use this video as a benchmark to help you guys understand your own work a little bit better so let's dive into today's project i would have forgot again one thing i do remember i forget the safety chain but after watching alex almost getting caught between the truck and the dump trailer that day [Music] so when we're breaking down a project like this we look at the material cost now this load of filter only cost 60 to buy but it also took an hour and a half to pick up and we needed a pickup truck and a dump trailer to do it so the delivery cost of your materials needs to go into the calculation of your projects because it's the little things that add up fast and not just on a job-by-job basis but at the end of the year when guys are finding that they just don't have any money left in their bank

Auto-generated from the video audio.