Review Completed Foundation and Septic System
At 9:11 in
There’s Not Enough Room For This Build
What happens here
With the concrete cured and the forms removed, the complete concrete foundation for the A-frame cabin is revealed. The waterproofed sections of the stem walls are visible (indicated by a black tar-like coating) before they are backfilled. The presenter highlights the air vents placed to prevent moisture buildup in the crawl space. He then confirms that the septic tank is buried and the drain field is fully installed and covered, marking a significant milestone in the cabin's construction. He expresses satisfaction with the progress and the vision coming to life.
Goal: The presenter proudly showcases the completed concrete foundation, including the waterproofed stem walls, and the fully installed and buried septic system and drain field.