Prepare Foundation Forms and Rebar
At 0:00 in
There’s Not Enough Room For This Build
What happens here
The presenter stands within the pre-excavated area, surrounded by extensive wooden formwork designed for the concrete foundation. Inside these forms, rebar is visibly placed and tied, ready for structural reinforcement. He explains that the inspector has already approved the rebar placement. The plan involves a two-step concrete pour: first for the footings (approximately 8 inches tall), and then, after removing the initial forms, new forms will be built for the stem walls. The stem walls will rise considerably, with some portions buried and others exposed to manage water drainage. Finally, waterproofing material will be applied to the buried sections of the stem wall to prevent moisture intrusion.
Goal: The initial phase involves ensuring the concrete formwork and rebar are correctly set up and inspected before concrete pouring can begin. This includes preparing for a two-step pour for footings and stem walls, and planning for future waterproofing.
Tools and materials
- Measuring Tape
- Rebar
- Rebar Ties
- Wooden Formwork
What they say
(1,361 characters)Hide
What they say
(1,361 characters)Auto-generated from the video audio.