Skip to main content

Site Preparation and Debris Removal

0:00
16:16
35.4K views

At 0:00 in

The Cat dies on the job #frickin

What happens here

The video opens with workers engaged in manual labor around an apartment building, shoveling dirt and performing initial grading. This is part of a larger project to prevent water infiltration and requires significant earthmoving. A black geotextile fabric is laid along the foundation line. Subsequently, a compact track loader (skid steer) is actively used to scoop up piles of mixed debris, including soil, grass, rocks, and potentially other construction remnants, and dump them into a large red dump truck. This demonstrates the initial phase of construction debris removal and site grading.

Goal: Workers perform initial site preparation by manually digging and leveling soil around an apartment building foundation to address water infiltration issues. A skid steer is then used to efficiently load mixed construction debris into a dump truck, showcasing its role in site clearance.

Tools and materials

  • Compact Track Loader (Skid Steer)
  • Dump Truck
  • Geotextile Fabric
  • Rakes
  • Shovels

What they say

Hide

[Music] foreign we've got water infiltrating into all of the buildings in this apartment complex that we're working on somewhere between 9 and 12 individual buildings are suffering extensive water damage and so today what you're going to see us doing is a combination of grading what we've got is a building and then we've got a divot or a pooling area right next to the foundation and sometimes today what we're going to be doing is cutting down the grade so that the water Can Shed away other times we're going to be adding enough fill soil into the pooling area so that the grades will shed properly and then we're going to be adding decorative rock and steel edging so we've got a really full day and a lot of work to do so let's just get this show rolling [Music] oh yeah [Music] so one of the things we have to be conscientious of is thermal heaving and here in Minnesota when we have a foundation underground the the heat from the building itself will keep the ground thawed about four foot out so if this is the building what will happen is a four foot zone out of the building this will always stay warm just from heat loss from the building but once you get outside of that four foot Zone then the frost can set in and this area can fluctuate up and down so at certain times of the year especially during Frost even the winter this will go up and in the spring it'll drop back down so sometimes your grades will look perfectly fine depending on the time of the year that you're looking at it and other times it'll look like it's just a pool capturing it yay Johnny [Music] foreign [Music]

Auto-generated from the video audio.