Final Assembly, Tensioning, and Inspection
At 13:33 in
The Cat dies on the job #frickin
What happens here
After successfully replacing the hydraulic lines and addressing any residual drips, the operator proceeds with the final steps to ensure the skid steer is ready for operation. This includes refilling the hydraulic system with fluid, securely rebolting the cab into place, and then carefully reinstalling the track. Once the track is back on, he re-tensions it using a powered grease gun, aiming for a specific tension level (checking with finger space). The access panel bolts are re-secured, and the machine is finally taken off the blocks. The video concludes with the skid steer being driven into a dedicated wash bay where it receives a thorough power wash. This cleaning step is crucial for visually inspecting all fittings for any potential leaks before the machine is returned to a job site, ensuring all repairs are solid and the equipment is safe for use in mixed material removal.
Goal: Complete all repairs, reassemble the machine, and verify its readiness for safe operation.
Tools and materials
- Power Washer
- Powered Grease Gun
- Wrenches
- Grease
- Hydraulic Fluid
What they say
(1,549 characters)Hide
What they say
(1,549 characters)Auto-generated from the video audio.