Refill Fluid, Re-install Track, and Adjust Tension
13:36
16:16
35.4K views
At 13:36 in
The Cat dies on the job #frickin
What happens here
After replacing the hoses, the hydraulic fluid reservoir is refilled. The skid steer's cab is re-bolted, and the track is carefully re-installed onto the machine. Once the track is in place, a Milwaukee grease gun is used to pump grease into the track adjuster. The operator demonstrates the 'two-finger' method for tensioning, where the track should be able to be lifted by approximately two fingers (about 1.5-2 inches) from the bottom roller. This ensures proper tension, which is crucial for track longevity and machine performance. The machine is then removed from the jacks.
Goal: Complete the hydraulic system, re-install the track, and set proper track tension.
Tools and materials
- Hydraulic Fluid Buckets — Refilling the hydraulic system
- Jacks — Lowering the skid steer from the blocks
- Milwaukee Grease Gun Milwaukee — Pumping grease into the track adjuster for tensioning
- Skid Steer Cab Bolts — Re-securing the cab