Skip to main content

Utilize 'Does Not Include' Clauses for Protection

19:20
34:52
15.4K views

At 19:20 in

The Bible of Job bidding

What happens here

It's essential to always include a clear 'does not include' section in your proposals to specify services or conditions not covered by your base bid. This is particularly important for 'soil corrections' (dealing with unsuitable soil), permits (which can vary widely and unpredictably), and other unforeseen circumstances. By explicitly excluding these, you protect your business from unexpected costs that can erode profits or even lead to losses. If such issues arise, they become 'change orders' for which you can submit a justified price adjustment.

Goal: Safeguard against unforeseen costs by clearly outlining exclusions in contracts.

Tools and materials

  • Contract Templates TheDirtMonkeyShop.com — Structuring proposals with clear inclusions and exclusions

What they say

Hide

of the Caps price of the glute these are all things now you can work like I work directly with versalock so I gave them the takeoff and I said I need the price for all of the materials for this retaining wall and they include the price of the engineered as well because the engineering can cost anywhere from 50 cents to a dollar per square foot it's not cheap to get engineering now permits I've always excluded because we never know what the city's going to Nick you for on a permit and I've always said to General Contractors that's your job to pull all the permits I'm not going to bother doing that and 99.9% of General contct but if you're on res residential you're the one that's going to be pulling the permit so you have to pull the permit the homeowners can't nope they can't it's so it's good to check with the city and see what what situation they have there if it's just a onetime fee or if it's per square foot or size of the project you know yeah um valuation valuation every city is different too per their regulations or what they require but in this situation you had a takeoff I don't know if you had engineering before the the the that the when you initially looked at the project if you had it all set up to where you could take a look and see how much Grid's going in um what layers how much block you're burying due to the height of the wall all take all that into consideration before you do your excavation bid or if you're keeping so your excavation you did here was probably separate from your wall excavation so now you're putting that in your price per square foot for your wall but it's nice to have have that engineering to see how how big a grid links they want cuz I know there's an Alleyway up there well that's going to lengthen your grid you can't just that that's a sear charge has a search charge on as a sech charge which means the wall needs more reinforcement which means you got to put deeper you got to put more layers in longer to hold up this retaining wall than if it was a flat level ground or if there's a hill or a building so a search charge is means the amount of weight that goes on the back side of this and it especially got tricky over here if you look there was a backyard so as we look up here in this corner here we got a backyard with a shed on top of it and the fence on on top of that so all of these things and the house right there so we had plenty of things that made this job go to the next level of difficulty simply because it wasn't…

Auto-generated from the video audio.