Calculate Demolition Quantities (Dumpsters)
3:29
34:52
15.4K views
At 3:29 in
The Bible of Job bidding
What happens here
The discussion shifts to calculating quantities, starting with demolition. For building demolition, the expert explains a method of estimating the number of dumpsters required. They allocate 1 hour per dumpster for demolition, material crunching, and loading. The dumpster cost itself covers hauling and disposal, but not the labor to fill it. This per-dumpster rate provides an estimate of both material removal cost and labor time.
Goal: Estimate material removal and labor time for demolition.
Tools and materials
- Dumpsters Various local providers — Removing demolition debris
- Excavator/Demolition Equipment — Breaking down structures and loading debris
What they say
(1,849 characters)Hide
What they say
(1,849 characters)Auto-generated from the video audio.