The speaker identifies the major components of the construction project at the Domino's site, which was previously a strip mall without a retaining wall. The project involved demolition of the strip mall, excavation of soil for a new retaining wall, installation of the retaining wall, and comprehensive underground utility and site work. These were the primary divisions they recognized for bidding and management.

Goal: Categorize the key work areas for a complex construction job.

What they say

Hide

other projects let's go all right you guys before this was a Domino's Pizza this was a strip mall without a retaining wall so the very first thing we had to do was take the strip mall and remove it and the strip mall was where the Domino's Pizza was and it came out to about where I'm at right now behind me there was no retaining wall this was just a hill that sloped up to an Alleyway so we had to break this project down into its most simplest components we knew that we were going to be demolishing a strip mall we knew that we were going to be Excavating all of this soil for the new retaining wall and we also knew that the retaining wall was going to be a big part of this job plus we did all of the underground utilities underneath here and we had to we did all of the site work we basically did everything from stem to ser besides actually physically building the building so we had to take into cons all those factors into consideration plus coordinating all of this all right so Alex when we first came out here we had a small uh strip mall that was here and then behind it there was just this hill of soil that came straight down and the general contractor wanted me to remove the strip mall wanted me to remove the existing parking lot wanted me excavate for that retaining wall before I did

Auto-generated from the video audio.