Skip to main content

Calculate Excavation for a Pond

5:24
13:34
12.2K views

At 5:24 in

STOP! WATCH this before you do a Bid.

What happens here

To calculate the excavation for a pond, return to the 'Cut/Fill' section of the Moasure app. Adjust the target level to -86.0 inches, which combines the initial -26.0 inches benchmark with an additional 60 inches (5 feet) for the pond's depth. The app will then display the total cut volume (74.6 yd³) required, with zero fill, as the entire area will be excavated.

Goal: Determine the total excavation volume for a pond of a specific depth.

Tools and materials

  • Moasure App Moasure — Calculating excavation volumes for a pond

What they say

Hide

foot deep right from that from elevation okay so now what we need to do is 5 is 60 in so we're going to add 60 in onto the 26 26 you've already got so that's what 86 in so you6 it to 86 in okay so now this will tell me what my what how much soil I've got to remove and as we look at this we can see that now we're cutting 74.6 cubic yards we're not feeling anything everything gets cut okay so now now is

Auto-generated from the video audio.