Prepare Sand Bed with Screed Rails

0:57
11:16
127.9K views

At 0:57 in

Semi Circular Paver Patio. Start to Finish Timelapse

What happens here

Workers meticulously set up temporary metal or wooden screed rails across the compacted aggregate base. These rails are precisely positioned using string lines and levels to ensure the correct height and a slight slope for drainage, moving away from the house. Fine bedding sand, such as concrete sand or washed sand, is then dumped onto the base and spread evenly between the rails using shovels and rakes. A long, straight screed board (e.g., a 2x4 or an aluminum screed tool) is pulled across the top of the rails. This action shaves off excess sand, creating a perfectly flat, smooth, and uniformly thick sand bed, which is critical for a level paver surface. Once an area is screeded, the rails are carefully removed, and the small voids are filled with sand.

Goal: Temporary screed rails are meticulously installed to define the exact height and slope of the paver bed. Fine sand is then spread and leveled between these rails to create a uniform, smooth surface for paver placement.

Tools and materials

  • Level (spirit level
  • laser level)
  • Rakes
  • Screed Board (2x4 or aluminum)
  • Screed Rails (metal or wood)
  • Shovels
  • Skid Steer Loader
  • String Line