Initial Site Excavation and Grading
0:00
11:16
127.9K views
At 0:00 in
Semi Circular Paver Patio. Start to Finish Timelapse
What happens here
The construction begins with preparing the site by excavating the existing soil to the required depth. Heavy machinery, such as a mini-excavator and a skid steer, are utilized for efficient soil removal. Workers manually assist with shovels and rakes to achieve a rough, uniform grade, ensuring the area is ready for the subsequent base layers of the patio. This foundational step establishes the overall footprint and initial depth of the paver patio.
Goal: Prepare the patio area by excavating existing soil and performing rough grading to achieve the necessary depth for the base layers.
Tools and materials
- Mini-Excavator
- Rakes
- Shovels
- Skid Steer (ASV RT-75)