Initial Paver Compaction
3:50
11:16
127.9K views
At 3:50 in
Semi Circular Paver Patio. Start to Finish Timelapse
What happens here
After all pavers are laid and edge restraints are installed, a plate compactor (like the Wacker Neuson visible in the video), often equipped with a protective rubber pad, is carefully run over the entire paver surface. This initial compaction serves a dual purpose: it settles the pavers deeper into the sand bedding layer, ensuring maximum interlock and a perfectly level surface, and it helps to achieve the final desired height of the patio.
Goal: Run a plate compactor over the laid pavers to settle them firmly into the sand bed, ensuring a level and stable surface.
Tools and materials
- Plate Compactor (Wacker Neuson)
- Protective Rubber Pad