Initial Site Excavation
At 0:00 in
Semi Circular Paver Patio. Start to Finish Timelapse
What happens here
The crew begins by using a mini excavator to dig and remove the top layer of soil and debris from the designated patio area, working carefully near the house foundation. Another worker assists with a rake to help define the edges and clear smaller piles of soil. A skid steer then collects the excavated soil and loads it into a dump truck (implied), efficiently moving it away from the construction site. This establishes the initial sub-grade for the patio base, ensuring proper depth and removal of unsuitable material.
Goal: Workers use heavy machinery, including a mini excavator and a skid steer, to excavate the designated patio area, removing existing soil and organic matter to establish the initial sub-grade.
Tools and materials
- Dump Truck
- Mini Excavator
- Rake
- Skid Steer Loader