Skip to main content

Install Transformer Pad

3:01
17:35
32.3K views

At 3:01 in

Power Company Comes WHAT A MESS!

What happens here

Install a pre-made pad system for the transformer near the shop building. This pad will serve as a stable base for the large, green pad-mount transformer that converts the high-voltage power to usable voltage for the shop. The cable will be stubbed up through pre-drilled holes in the pad, ready for connection to the transformer once it arrives.

Goal: Prepare a stable base for the power transformer.

Tools and materials

  • Pre-made Transformer Pad — Providing a stable base for the electrical transformer