Install Transformer Pad
3:01
17:35
32.3K views
At 3:01 in
Power Company Comes WHAT A MESS!
What happens here
Install a pre-made pad system for the transformer near the shop building. This pad will serve as a stable base for the large, green pad-mount transformer that converts the high-voltage power to usable voltage for the shop. The cable will be stubbed up through pre-drilled holes in the pad, ready for connection to the transformer once it arrives.
Goal: Prepare a stable base for the power transformer.
Tools and materials
- Pre-made Transformer Pad — Providing a stable base for the electrical transformer