Layered Backfilling with Clean Soil
13:10
14:33
44.8K views
At 13:10 in
Pool Removal GONE WRONG. Breaking up the Pool & popping concrete 4 k video
What happens here
In the final operational segment, the excavator spreads fresh, clean soil across the pool excavation. This process involves creating multiple layers of fill, with each layer being carefully distributed before compaction. The narrator highlights the strategy of filling the bottom of the pool first to create a stable and safe working platform for the excavator and other equipment.
Goal: Fill the excavation with clean soil in preparation for final grading.
Tools and materials
- Excavator Daewoo 75V — Spreading and leveling soil
- Skid Steer — Transporting clean soil to the excavation site
- Clean Soil — Backfilling the pool excavation
What they say
(507 characters)Hide
What they say
(507 characters)Auto-generated from the video audio.