Skip to main content

Compacting First Backfill Layer

5:10
14:33
44.8K views

At 5:10 in

Pool Removal GONE WRONG. Breaking up the Pool & popping concrete 4 k video

What happens here

The operator drives the excavator over the freshly spread dirt layer, repeatedly pressing the vibratory plate compactor into the ground. A skid steer continues to deliver fresh soil to the edge of the excavation. The narrator cautions against excessive force during compaction, specifically mentioning the risk of damaging the excavator's hydraulic seals, emphasizing that proper compaction is achieved through even passes rather than brute force.

Goal: Achieve optimal compaction of the initial backfill layer.

Tools and materials

  • Excavator Daewoo 75V — Operating the compactor
  • Skid Steer ASV RT-75 — Delivering fill material

What they say

Hide

after they popped Jim's pulling up the metal on the site kind of like folding up the sheets they go on your bed because he we can fit more in a truck that way until you crunch it up crunch it up the wrong thing

Auto-generated from the video audio.