Skip to main content

Trenching and Retaining Wall Installation

5:50
22:05
10K views

At 5:50 in

Pond day #5 Mistakes were made

What happens here

Tools and materials

  • Kubota Excavator
  • Wheelbarrow
  • Boulders
  • Dirt/Soil

What they say

Hide

he'll be over here doing this nobody even be around in him keep talking so here's one of the two things that I really screwed up when I was building this Pond is right here I have this weird angled slope and I fought it during the entire Pond build knowing that I had to put in a boulder retaining wall to level that grade out I should have stuck the boulder retaining wall in the very first day and just gave myself a flat level ground to work on instead of waiting until after the pond was done and then building the boulder wall it would have just saved me so much time energy and effort and the other thing I screwed up well I'll show you that in just a minute before I can install this Boulder wall I've got to demu the area we've had rain every single day this week and it's just taken over everywhere so the muck has to go we don't need very big boldies there do we well how high you you want to go with it level level with the pond yeah almost level but I mean we're going to have a little bit of a taper down but I I think four boldies at about ah they don't need to be that eye L one f

Auto-generated from the video audio.