What happens here

After placing the dead tree, the team continues to apply soil to cover and embed it fully into the bank. This involves moving more soil with the Kubota excavator and compact utility loader, and then manually spreading it. The objective is to ensure the tree is securely nestled and fully integrated into the landscape, providing the intended bank fortification and preparing the area for future planting. The process emphasizes the need for continuous soil management and grading to achieve the desired aesthetic and functional stability of the pond surroundings.

Goal: The final stage involves spreading additional soil to fully bury and stabilize the installed tree, along with shaping and compacting the surrounding landscape to prevent erosion.

Tools and materials

  • Kubota Excavator Kubota
  • Rake
  • Shovel
  • Black Dirt (Topsoil)

What they say

Hide

better but it could be worse [Music] he so this is the other part of the project that I wish I would have done a little bit different you can see that I'm scooping dirt over the fence which completely limits my visibility I wish I would have fortified this bank before I actually started building the pond with the rest of the guys but hey hindsight's 2020 on some things and we're still able to get in and get the job done so overall everything is good but this Bank requires a lot more work than what we're doing right here so make sure you guys stick around because the next video we show you the magic thing that we use to finish stabilizing this bank I don't want to give it away