Excavate and Level Muddy Areas

5:55
22:05
10K views

At 5:55 in

Pond day #5 Mistakes were made

What happens here

Stanley operates the Kubota excavator to 'demuck' a problematic area near a fence line. He identifies this sloped section as a significant design flaw from the initial pond construction, stating he should have fortified it earlier. Due to continuous rain, this area has become extremely muddy and unstable. The excavator digs out the saturated soil to create a more manageable, level surface. The goal is to remove the soft, waterlogged material to prevent further mud runoff into the pond and establish a solid base for future boulder walls and grading.

Goal: The excavator is utilized to remove excess muddy soil from a challenging sloped area near a fence, aiming to create a more level and stable base for further landscaping.

Tools and materials

  • Kubota Excavator Kubota
  • Shovel

What they say

Hide

even be around in him keep talking so here's one of the two things that I really screwed up when I was building this Pond is right here I have this weird angled slope and I fought it during the entire Pond build knowing that I had to put in a boulder retaining wall to level that grade out I should have stuck the boulder retaining wall in the very first day and just gave myself a flat level ground to work on instead of waiting until after the pond was done and then building the boulder wall it would have just saved me so much time energy and effort and the other thing I screwed up well I'll show you that in just a minute before I can install this Boulder wall I've got to demu the area we've had rain every single day this week and it's just taken over everywhere so the muck has to go we don't need very big boldies there do we well how high you you want to go with it level level with the pond yeah almost level but I mean we're going to have a little bit of a taper down but I I think four boldies at about ah they don't need to be that eye L one f now yeah put sand over everything would it take us 3 hours to get to this point Zach we couldn't get in it was the the the hill was too slimy so we had to build this up we did some Bolder settings right here built this up but to get this dirt we had to go into the pile and dig down to Tim Buck to cuz everything on top is just slime where was this in the winter when it could have turned to snow and I could have made money off from this wet moisture nest so that's what I'm doing that's what I've been doing digging down but we finally got it to the point where we can maybe set a baly or two

Auto-generated from the video audio.