Screed the Sand Setting Bed
At 14:41 in
Pavers-Mastering the basics
What happens here
Once the compacted Class 5 base is complete, carefully lay down screed bars (metal pipes are commonly used) at the desired height for the sand bed. The sand layer should be thin (around 3/4 inch to 1 inch). Spread sand over the base, covering the screed bars. Using a long, straight screed board (often a 2x4), drag it across the screed bars to remove excess sand and create a perfectly smooth, level surface. Carefully remove the screed bars and fill the voids with sand, smoothing them over. This sand bed is not compacted, as it allows for minor adjustments when setting the pavers.
Goal: Install screed bars and apply a layer of sand, then use a screed board to create a perfectly flat and level surface for paver installation.
Tools and materials
- Level
- Screed Bars (metal pipes)
- Screed Board (2x4 or similar)
- Shovel
- Paver Sand