What happens here

Once the compacted Class 5 base is complete, carefully lay down screed bars (metal pipes are commonly used) at the desired height for the sand bed. The sand layer should be thin (around 3/4 inch to 1 inch). Spread sand over the base, covering the screed bars. Using a long, straight screed board (often a 2x4), drag it across the screed bars to remove excess sand and create a perfectly smooth, level surface. Carefully remove the screed bars and fill the voids with sand, smoothing them over. This sand bed is not compacted, as it allows for minor adjustments when setting the pavers.

Goal: Install screed bars and apply a layer of sand, then use a screed board to create a perfectly flat and level surface for paver installation.

Tools and materials

  • Level
  • Screed Bars (metal pipes)
  • Screed Board (2x4 or similar)
  • Shovel
  • Paver Sand

What they say

Hide

the max series cam is amazing the max series cabin the asv is incredible i'll show you that in a different video you guys are here for this so let's just think on one track here so you can see where exactly what they're doing and if you can't they're screening the base they'll pack it sand it here's an interesting thing they didn't they've got to make that patio blend into the stairs right where blaine is working right now and so he had to do all of the math blaine to calculate that those pavers would hit exactly into those stairs just right but you can see the string lines he's got running