Skip to main content

Prepare Site and Mark Out Path

0:00
20:40
677.1K views

At 0:00 in

Pavers-Mastering the basics

What happens here

Begin by setting up string lines to define the edges of the planned paver path. Use these lines to measure and verify the current depth of the soil along the entire length of the path. The goal is to determine how much material needs to be excavated to achieve the desired final elevation. For this project, the desired base depth was 6-7 inches below the final paver surface.

Goal: Establish the exact dimensions and elevation for the paver walkway or patio using string lines and a tape measure, ensuring correct depth for excavation.

Tools and materials

  • String Line
  • Tape Measure

What they say

Hide

okay we got our class five back here next step i'm gonna run this string line way back up there by the mini x it's right here so we're gonna match the pavers for the path are gonna we're gonna match the top of the stairs here obviously so we're gonna run that right here then we're gonna go along with the handy dandy tape measure and check our depths we're gonna have to come down quite a bit still it looks like nine inches

Auto-generated from the video audio.