Skip to main content

Install and Compact Class 5 Base Material

4:30
20:40
677.1K views

At 4:30 in

Pavers-Mastering the basics

What happens here

Bring in Class 5 aggregate (recycled asphalt and concrete from roads and curbs, crushed and mixed with fines) using a skid steer. This material is environmentally friendly and compacts very hard. Spread the Class 5 material evenly across the excavated area in thin layers, known as 'lifts.' For a 6-inch base, two 3-inch lifts are recommended to ensure proper compaction. Use a 150lb plate compactor to thoroughly compact each lift. Good compaction is vital to prevent future settling and maintain the paver surface's stability. If large chunks are present in the Class 5 material, they must be broken down before compaction.

Goal: Lay down and thoroughly compact Class 5 aggregate in multiple lifts to create a dense and stable foundation for the pavers.

Tools and materials

  • Dump Trailer
  • Plate Compactor (Tomahawk 150lb)
  • Rake
  • Shovel
  • Skid Steer (ASV RT-50)
  • Class 5 Aggregate

What they say

Hide

half inches and six inches which is plenty so i'm gonna run the packer over it and then we're gonna start bringing class five back and packing it and what so what sam said is the four inches is what we like to use as a minimum six inches is really what we do like to shoot for and it's always better to air on the side of going heavy so if they go seven or eight inches what is it going to cost the company a few extra bucks but it's gonna make sure it's better than going too light which is like two or three inches worst possible thing you can do so the deeper you put that base though you gotta make sure that you get good compaction now sam's using 150 pound plate packer this is actually our finished packer and although it will suffice for the base we don't like to put all of the base in at once in pack it would like to put it in so i got the class 5 on all of this dialed in yesterday i was kind of shooting from the hip and just eyeballing it last night and we need three inches from the top of the line to the top of the class five because that's her sand and pavers like i said i was eyeballing it it's like three inches on the nuts the whole way down so feeling kind of good about that anyways uh blaine's up getting sand sounds like the place we get that ed is freaking real busy today so he's gonna be a little bit uh so plan for today i have this little strip in between that class five and this class five we gotta excavate out get class five in all that kind of stuff and i'm just gonna throw this out here right now i'm not gonna lie i don't have a ton of experience on the mini x i mostly just run the skid steers so for all of y'all that could probably do better in your sleep and all that kind of stuff first step at being good at something is being bad at it well said sam just chill well said sam brave boy actually filming uh you know something that he's not good at so let's go back to what we were talking about earlier with uh packing it and lifts we're using about six inches of base material but we're packing it in two lifts that way we make sure we're good now technically 150 pound plate packer could possibly do it in one lift but we know it will do it and two lifts twice as well not twice as good technically because he can only hit so much density of your soil and having your soil too dense isn't a bad thing [Music] so you can see sam's being actually pretty careful not to over dig all right we got most out of that's a little bit excavated here plane just…

Auto-generated from the video audio.