Layout and Digging Footings
0:29
18:31
57.6K views
At 0:29 in
Most Decks Are Over Complicated. (Do This, It's Easier)
What happens here
Using a tape measure, accurately mark out the perimeter of the planned deck and the locations for the footings. Drive stakes into the ground at these marked points to create a visual guide. Then, use a compact excavator (mini excavator) with a 25-inch bucket to dig the footing holes. The holes should be 36 inches deep and 25 inches wide to accommodate the Sonotube concrete forms. Clean up the edges of the holes with a shovel to ensure a comfortable fit for the Sonotubes.
Goal: Excavate holes for the deck footings
Tools and materials
- 25-inch Excavator Bucket — Used with the excavator for digging the specified width
- Compact Excavator Yanmar ViO35 — Digging the footing holes efficiently
- Hammer — Driving stakes into the ground
- Shovel — Cleaning up the edges of the dug holes for Sonotube installation
- Stakes — Marking footing locations in the ground
- Tape Measure — Measuring and marking deck dimensions and footing locations