Installing Floor Joists and Blocking
At 9:51 in
Most Decks Are Over Complicated. (Do This, It's Easier)
What happens here
Position the 2x10 pressure-treated floor joists into the installed joist hangers on the ledger board, running perpendicular to the house and resting on the main support beam. Secure the joists to the hangers using 3-inch exterior-grade nails. At the main beam, back-nail the joists by driving nails or screws through the side of the joist into the beam for added lateral stability. The main beam is designed to handle the vertical load, so no hangers are needed on this side. Once joists are installed, cut and fit blocking between them along the perimeter of the deck. This blocking provides a solid attachment point for the perimeter decking boards and prevents lateral movement.
Goal: Create the structural framework for the deck surface
Tools and materials
- 2x10 Pressure-Treated Lumber — Floor joists and blocking
- 3-inch Exterior Grade Nails — Securing joists and blocking
- Circular Saw Ryobi — Cutting blocking to size
- Hammer — Driving nails
- Impact Driver Ryobi — Driving screws (if used instead of nails)