Test the Temporary Water Line
14:16
14:58
25.6K views
At 14:16 in
Installing Pex Water Main Line...Part 1
What happens here
With all connections made, slowly turn the main water supply on at the water meter. Once pressure is established, slowly open the newly installed shut-off valve at the house. Carefully inspect all new connections for any signs of leaks. The system is now operational, providing temporary water to the house.
Goal: Verify the temporary water line is functional and leak-free
Tools and materials
- Newly Installed Shut-off Valve Apollo — Controlling water flow to the house
- Water Meter Neptune — Controlling the main water supply