Skip to main content

Prepare Water Meter Connection

8:28
14:58
25.6K views

At 8:28 in

Installing Pex Water Main Line...Part 1

What happens here

At the water meter, remove the existing brass nipple by using two pipe wrenches in opposing directions: a 12-inch ratcheting pipe wrench for the nipple and an 18-inch rigid aluminum pipe wrench for backup. Prepare a new brass nipple by wrapping its threads approximately 7-10 times with white Teflon tape, ensuring to keep the tape away from the tip of the threads to prevent clogs. Then, apply a layer of MegaLock pipe dope over the Teflon tape. Screw the prepared nipple into the water meter connection by hand until it's hand-tight, then use the pipe wrenches to tighten it securely, using the 12-inch ratcheting pipe wrench for the final tightening.

Goal: Create a secure, sealed connection point at the water meter

Tools and materials

  • 12-inch Ratcheting Pipe Wrench — Removing and tightening the brass nipple
  • MegaLock Pipe Dope MegaLock — Further sealing and lubricating threaded connections
  • New Brass Nipple — Creating the connection point at the meter
  • Protective Gloves — Protecting hands from tools and debris
  • White Teflon Tape — Sealing threaded connections