Unpacking and Initial Layout
0:52
34:23
41.8K views
At 0:52 in
Installing My BendPak XPR-10AS Two Post Lift From Summit Racing! Is It Worth Doing It Yourself?
What happens here
Unbolt existing packaging material from the lift using appropriate sockets. Use a floor jack and a piece of wood to carefully stabilize the lift components while working. Remove a metal support structure from the lift posts that was part of the shipping packaging. A socket from a tool set is initially tried, but it is too small.
Goal: Unpack the lift components and prepare them for positioning.
Tools and materials
- Floor Jack — Stabilizing heavy lift components
- Metal Support Structure — Packaging material to be removed
- Piece of Wood — Supporting lift components during unpacking
- Socket Set — Unbolting packaging materials
What they say
(1,942 characters)Hide
What they say
(1,942 characters)Auto-generated from the video audio.