Positioning the Posts and Initial Cable Routing
5:12
34:23
41.8K views
At 5:12 in
Installing My BendPak XPR-10AS Two Post Lift From Summit Racing! Is It Worth Doing It Yourself?
What happens here
The presenter and Mike manually lift and position one of the main lift posts. They use a top cross-piece (which will connect the two posts later) as a temporary guide to ensure the correct spacing between the posts. This helps to visualize the final placement before permanent anchoring.
Goal: Roughly position the lift posts.
Tools and materials
- Lift Posts BendPak — Main vertical structures of the lift
- Top Cross-Piece BendPak — Used as a spacing guide between posts
What they say
(668 characters)Hide
What they say
(668 characters)Auto-generated from the video audio.