Electrical Hookup and Microswitch
24:30
34:23
41.8K views
At 24:30 in
Installing My BendPak XPR-10AS Two Post Lift From Summit Racing! Is It Worth Doing It Yourself?
What happens here
Mike connects the electrical components, including a heavy-duty shut-off switch (disguised as a light switch for simplicity) to the lift's power unit. The microswitch is also wired up, which acts as a safety mechanism. The presenter notes that they are still missing some pulleys and retainers for the cables, but proceeds with other connections.
Goal: Complete the electrical connections for safe operation.
Tools and materials
- Microswitch — Safety mechanism for lift operation
- Pulleys BendPak — Cable routing (missing for now)
- Retainers BendPak — Securing pulleys (missing for now)
- Shut-off Switch — Providing an emergency power disconnect for the lift
- Wiring — Connecting electrical components