Set Screed Rails and Establish Guide Lines

2:59
18:35
1.2M views

At 2:59 in

Installing Brick pavers -start to finish day2

What happens here

Before laying the sand, it's essential to establish true square lines. Since existing structures like the sidewalk and house might be crooked, a measuring tape is used to mark out a new, perfectly square guide line for the paver layout. One-inch diameter galvanized steel plumbing pipes are laid down on the compacted Class 5 base to act as screed rails. A level is used to ensure these pipes are perfectly set, as their elevation directly determines the uniform depth of the sand layer and the overall pitch of the driveway. Any Class 5 material disturbed during this process is re-compacted with a hand tamper.

Goal: Prepare a perfectly level and square framework for the sand layer.

Tools and materials

  • Carpenter's Square — Ensuring perfect 90-degree angles for the layout
  • Chalk Line — Snapping straight lines on the Class 5 base
  • Galvanized Steel Plumbing Pipe — Acting as screed rails to set the sand depth
  • Hand Tamper — Re-compacting disturbed Class 5 material
  • Level — Ensuring screed rails are perfectly level
  • Measuring Tape — Measuring distances and laying out square lines

What they say

Hide

that comes next what do you think about where we're trying to figure out so Blaine is going to Center this parking spot on its own what I mean is he's not going to Center it off from that sidewalk next door because that could be off and even the way the house is laid out could be off so he wants to make sure that when he puts this in he gets everything just right once the boys have the class five to the exact elevation that they want they lay down the pipe and that black pipe you see there that's just galvanized steel plumbing pipe one-inch the purpose of that pipe is to set the depth for the sand that comes next as they embed the pipe into the class five they make track clean up their dribbles plain make sure that the screen rails are set perfectly level because those screed rails set the elevation for the sand which determines how the pitch of the driveway ultimately goes so everything depends on each stage being prepped and ready before the next one moves on before the sand gets laid out and screed it off he makes sure that all of his elevations are on so he goes down the entire length of the pipe double-checking everything and making any fine-tune adjustments before the material gets put in place anything that worked loose from adjusting the rails get sri compacted before the sand goes down mouth sucks and with both blaine and tim fighting