Set Screed Rails and Establish Guide Lines
At 2:59 in
Installing Brick pavers -start to finish day2
What happens here
Before laying the sand, it's essential to establish true square lines. Since existing structures like the sidewalk and house might be crooked, a measuring tape is used to mark out a new, perfectly square guide line for the paver layout. One-inch diameter galvanized steel plumbing pipes are laid down on the compacted Class 5 base to act as screed rails. A level is used to ensure these pipes are perfectly set, as their elevation directly determines the uniform depth of the sand layer and the overall pitch of the driveway. Any Class 5 material disturbed during this process is re-compacted with a hand tamper.
Goal: Prepare a perfectly level and square framework for the sand layer.
Tools and materials
- Carpenter's Square — Ensuring perfect 90-degree angles for the layout
- Chalk Line — Snapping straight lines on the Class 5 base
- Galvanized Steel Plumbing Pipe — Acting as screed rails to set the sand depth
- Hand Tamper — Re-compacting disturbed Class 5 material
- Level — Ensuring screed rails are perfectly level
- Measuring Tape — Measuring distances and laying out square lines
What they say