Level and Compact Class 5 Base

1:55
18:35
1.2M views

At 1:55 in

Installing Brick pavers -start to finish day2

What happens here

After the initial rough adjustment, workers manually refine the Class 5 base. They use landscape rakes to spread and level the material, adding or removing small amounts with shovels to ensure a smooth and even surface. Once leveled, a plate compactor is used to firmly compact the entire Class 5 base, with special attention to any high or low spots. For smaller, hard-to-reach areas, a hand tamper is used to ensure uniform compaction. The base material should be 8 inches thick and compacted in two 4-inch lifts.

Goal: Create a perfectly level and uniformly compacted Class 5 base.

Tools and materials

  • Hand Tamper — Compacting small or hard-to-reach areas
  • Landscape Rakes — Spreading and leveling the Class 5 material
  • Plate Compactor Wacker Neuson — Compacting the Class 5 base
  • Shovels — Adding or removing Class 5 material as needed
  • Class 5 Base Material — The foundational layer

What they say

Hide

case that's 8 and 5/8 inches thick boys add a little class 5 in places and take a little bit away they want to get this perfect because the depth of the class vibe determines the depth of the sand you don't want any more than one inch of sand anywhere beneath the paver project [Music] this base material is eight inches thick and has been packed into two lifts at four inches each any higher bow spots on the classify base get worked out so that they don't impact the depth of the sand that comes next what do you think about