Lay and Screed the Sand Base
5:07
18:35
1.2M views
At 5:07 in
Installing Brick pavers -start to finish day2
What happens here
Bulk bags of sand are delivered via a skid-steer loader and distributed across the prepared Class 5 base, between the screed rails. Workers then use a wooden screed board to level the sand layer. One person pulls the screed board across the rails, while another follows behind, filling any low spots with additional sand and ensuring a smooth, uniform 1-inch depth. Once a section is screeded, the steel pipes are carefully removed, and a hand trowel is used to fill in the channels left by the pipes, maintaining the level surface.
Goal: Create a perfectly level, 1-inch thick sand bed for the pavers.
Tools and materials
- Hand Trowel — Smoothing sand and filling channels left by screed rails
- Shovels — Distributing sand and filling low spots
- Skid-Steer Loader Caterpillar — Transporting bulk bags of sand
- Wooden Screed Board — Leveling the sand layer
- Galvanized Steel Plumbing Pipe — Used as screed rails
- Sand — The bedding layer for the pavers
What they say