Install Edging, Compact, and Joint Sand
At 14:52 in
Installing Brick pavers -start to finish day2
What happens here
Once all pavers are laid and custom cuts are made, a plastic edging is installed around the perimeter of the driveway to hold everything in place. Workers use a hand trowel to dig down the dirt along the edges of the pavers, creating a trench for the edging. The plastic edging is then positioned and secured by hammering metal spikes through its designated holes into the ground. After the edging is installed, a plate compactor is used to compact the entire paved area, ensuring the pavers settle firmly into the sand base. Finally, sand is swept into all the joints between the pavers to lock them in place. This process of sweeping and compacting is repeated to fully fill the joints, and a final sweep-off removes any excess sand.
Goal: Secure the pavers with edging, compact the surface, and fill joints for a finished, stable driveway.
Tools and materials
- Hammer — Driving in metal spikes to secure the edging
- Hand Trowel — Digging trenches for the edging
- Knee Pads — Protecting knees during kneeling work
- Plate Compactor Wacker Neuson — Compacting the entire paved area and settling joint sand
- Push Broom — Sweeping sand into paver joints
- Joint Sand — Filling gaps between pavers to lock them in place
- Metal Spikes — Anchoring the plastic edging
- Plastic Edging — Securing the perimeter of the paver driveway