Skip to main content

Transfer Mixed Epoxy to Roller Tray

3:49
12:26
84.3K views

At 3:49 in

How to Epoxy Your Garage Floor Like a Pro | Affordable Rust-Oleum Industrial Floor Coatings

What happens here

Once the epoxy is thoroughly mixed, carefully pour the entire contents from the measuring bucket into a large roller tray (Purdy). When pouring, do not rely solely on the bucket's handle, as it can be weak; instead, support the bottom of the bucket to prevent spills. This ensures that only properly activated material is transferred, leaving any unactivated material (often found on the sides of the mixing bucket) behind.

Goal: Prepare epoxy for application by transferring it to a roller tray.

Tools and materials

  • Measured Mixing Bucket MeasurexContainer holding the freshly mixed epoxy
  • Mixed Epoxy Primer Seal-KreteThe ready-to-use primer mixture
  • Roller Tray PurdyHolding the epoxy for roller application

What they say

Hide

activated whenever we mix this up we have about a 45 minute window now until this won't be usable we're going to get 250 ft a gallon and when you're working out of a pan that can take a little bit of a time so when working by yourself I only recommend one gallon at a time uh especially if it's getting hotter out in the day another thing if I was bringing this bucket onto the floor I would want to pour it into a secondary bucket cuz there's going to be on activated material on the side of the bucket and we definitely don't want that on the floor so by pouring it out into this container anything that's activated is going to pour out and then anything that stays in there we're going to consider that as not activated

Auto-generated from the video audio.