Skip to main content

Initial Floating and Leveling

0:00
14:51
19.9K views

At 0:00 in

How the Pro's Pour Concrete with Victory Outdoor Services #3

What happens here

After the concrete has been freshly poured and screeded to the desired height, a long-handled bull float is used. The worker pushes and pulls the float across the entire surface of the concrete. This action helps to embed the aggregate just below the surface, remove any minor imperfections or ridges created during screeding, and prepares the surface for subsequent finishing steps. The goal is to achieve a generally flat and smooth surface.

Goal: This step involves using a bull float to initially smooth the concrete surface, remove any high spots or ridges left by screeding, and bring 'cream' (finer cement paste) to the top for a better finish.

Tools and materials

  • Bull Float
  • Long Handle (for Bull Float)

What they say

Hide

[Music] hey i expected a mistake and you didn't disappoint thank you i don't like to disappoint people just tell me what else you want me to wreck and i'll get right on it so you got a pretty good ridge going there so now when you pull it back pull it hold about six inches to the left so i get see that ridge yep so you get rid of that ridge and then you're good do i slide it over or just so as you're pulling it you kind of slide it over as you're coming back oh man yep now just walk it over a little bit six eight 12 inches oh you're good concrete's wet it's going to leave ridges right now that's okay nice job okay pretty sure that deserves a high fiber oh thank you bam got it he's better than you already sarge

Auto-generated from the video audio.