Skip to main content

Initial Concrete Floating

0:00
14:51
19.9K views

At 0:00 in

How the Pro's Pour Concrete with Victory Outdoor Services #3

What happens here

Begin by using a bull float, a long-handled tool with a wide, flat blade, to smooth out the surface of the wet concrete. This process helps to embed aggregate, remove any surface imperfections or ridges left by screeding, and bring 'cream' (finer cement paste) to the surface. Push the bull float across the concrete, making overlapping passes. The worker in the video is instructed to slide the float about 6 inches to the left on the return pull to eliminate any ridges created by the previous pass.

Goal: This step involves using a bull float to initially level and smooth the surface of the freshly poured concrete, ensuring a flat and consistent base.

Tools and materials

  • Bull Float
  • Extension Handles

What they say

Hide

[Music] hey i expected a mistake and you didn't disappoint thank you i don't like to disappoint people just tell me what else you want me to wreck and i'll get right on it so you got a pretty good ridge going there so now when you pull it back pull it hold about six inches to the left so i get see that ridge yep so you get rid of that ridge and then you're good do i slide it over or just so as you're pulling it you kind of slide it over as you're coming back oh man yep now just walk it over a little bit six eight 12 inches oh you're good concrete's wet it's going to leave ridges right now that's okay nice job okay pretty sure that deserves a high fiber oh thank you bam got it he's better than you already sarge

Auto-generated from the video audio.