Install Subfloor (Decking)
At 1:24 in
Frame an 8x12 shed: Intermediate lesson!
What happens here
Install the subfloor (decking) using 3/4-inch plywood or OSB, such as AdvanTech brand. Before fastening, take a corner-to-corner measurement of your framed floor to ensure it is perfectly square; both diagonal measurements should be equal. Position the first sheet of plywood, tacking it in place with a few fasteners to align it correctly. It is crucial to stagger the seams of subsequent plywood sheets for structural integrity. Use an impact driver with 2-3/8 inch ring shank nails or screws to securely fasten the subfloor to the joists. After all sheets are laid, use a chalk line to mark any excess overhang and trim it with a circular saw. Finally, ensure the entire base is leveled in both directions, shimming as necessary, to prepare for wall framing.
Goal: Create a solid and level subfloor for the shed
Tools and materials
- 3/4 inch Plywood or OSB AdvanTech — Subfloor material
- Chalk Line — Marking straight lines for trimming
- Circular Saw Makita — Trimming excess subfloor material
- Impact Driver — Driving screws or ring shank nails
- Tape Measure — Measuring for squareness and marking cuts
- 2-3/8 inch Ring Shank Nails or Screws — Fastening subfloor to joists
What they say
(874 characters)Hide
What they say
(874 characters)Auto-generated from the video audio.