Sourcing and Transporting Additional Stones
6:59
15:32
115.9K views
At 6:59 in
FAILING house foundation 2/2 . 4 k video
What happens here
To build the robust retaining walls required for proper grading, the team travels to their own yard, which houses a personal stockpile of various boulders. Using a skid steer, they meticulously sort through the stones, selecting those with specific sizes and shapes suitable for the retaining wall design. These chosen boulders are then carefully loaded into a dump truck, preparing them for transport back to the job site.
Goal: Workers visit their personal yard to sort through a stock of boulders, selecting specific sizes and shapes for the retaining walls, which are then loaded onto a dump truck.
Tools and materials
- Dump Truck
- Skid Steer
- Boulders (various sizes) Unspecified