Hand Tamping and Strategic Stone Placement
5:55
15:32
115.9K views
At 5:55 in
FAILING house foundation 2/2 . 4 k video
What happens here
Given the delicate condition of the previously cracked and patched foundation, heavy compaction equipment is avoided. Instead, workers manually hand-tamp the gravel and soil backfill to achieve a stable density without risking further damage to the foundation. Simultaneously, large boulders are carefully selected and positioned by hand, forming the base of new retaining walls. These walls are crucial for supporting the new grade and directing water flow.
Goal: Due to the compromised foundation, backfill is hand-tamped for gentle compaction, and large stones are strategically placed to form retaining walls.
Tools and materials
- Hand Tamper
- Shovels
- Large Boulders Unspecified
What they say
(908 characters)Hide
What they say
(908 characters)Auto-generated from the video audio.